| Front Porch Section |
| Garage |
| Starting to add the Corbels |
| Installing Corbels |
| Installing Corbels Garage Side |
| Corbels Installed and Clay Pipes Installed. Ready for Roofer Tomorrow |
| Bedroom Side Roof Complete |
| Front Elevation |
| Garage with Corbels and Clay Pipes |
| Corbels |
| Back of Water Heater Box. Water line ready for House Filter |
| Water Manifold |
| Duckwork |
| Duckwork |
| Master Shower Plumbing. Body Sprayers and Hand Shower |
| Master Shower Rain Can |
| Master Sink Area |
| Family Room |
| Guest Bath |
| Arch To Dining Room |
| Arch to Bedrooms |
No comments:
Post a Comment