Monday, March 3, 2014

Wood Floors / Stucco

Rear Porch Tile -  

Kitchen Wood

Wood Kitchen

Master Bedroom

Master Bedroom

Start of Cabinets

Start of Color

Start of Stone

Stucco Color

Monday, January 6, 2014

Thursday, December 12, 2013

Framing

Front Porch Section

Garage


Starting to add the Corbels


Installing Corbels

Installing Corbels Garage Side

Corbels Installed and Clay Pipes Installed.  Ready for Roofer Tomorrow

Bedroom Side Roof Complete

Front Elevation

Garage with Corbels and Clay Pipes

Corbels

Back of Water Heater Box.  Water line ready for House Filter

Water Manifold

Duckwork

Duckwork

Master Shower Plumbing.  Body Sprayers and Hand Shower

Master Shower Rain Can

Master Sink Area

Family Room

Guest Bath

Arch To Dining Room

Arch to Bedrooms

Thursday, November 21, 2013

Slab

Footings

Footings

Tamper

Post Tension

Post Tension

Ready to Pump

Pumping

Finished Slab

Finished Slab

Framing Materials

Friday, November 8, 2013

Rockwalls, Forms and Plumbing Rough

Start of west wall

Rear wall and west wall

Inside rear wall and west wall
 

Rear wall and east wall

Finish Grade

Finish Grade

Front wall

Working on finish grade

Finish grade

Setting forms

Forms set

Plumbing rough

Plumbing rough

Plumbing rough

Covered plumbing